Elementary School
On April 27th 1955, the municipality of Busto Arsizio commissioned the engineer and architect Enrico Castiglioni and the engineer Dante Brigatti to prepare, in collaboration, the design of a primary School building and its furnishing to be built in Sempione district. The original project included 10 classrooms divided into three blocks, to be built in two steps. The construction was never completed and only the two blocks (for 6 classrooms) were built. The building is featured by the original structural design of two “Π-shaped” portals in exposed reinforced concrete and by folded glass walls with iron-windows frames.