| Condition | In use. Originally exposed concrete now painted gray. In the years 2006 to 2007 the church was rebuilt barrier-free by Ludwig Schwöbel. |
| Architects | Carlfried Mutschler / Otto Herbert Hajek |
| Construction Date | 1967 |
A square floor plan, covered by a folding roof standing on 8 pillars. The exposed concrete church attracts special attention because of its cubic tower and the integrated reliefs. Inside the church, a play of light is created by the unclosed area between the ceiling and the façade.