| Condition | Refurbishments are forthcoming. It is planned to change the outward appearance by covering the facades with insulations. |
| Architects | Egon Seidel |
| Construction Date | 2023 |
There are two main tracts of the building: one has a mixed facade with raw concrete and clinkers, the other is fully raw concrete and has a relief designed by Karl-Heinz Deutsch on one side. Both tracts are connected to each other via two corridors.