| Condition | Empty since 2010 due to contamination with PCB. Concrete slabs have started to fall down from the facade and had to be disassembled. The very valuable site located on the immediate riverfront will probably be sold for redevelopment. Demolition imminent. Special thanks to Sven Schulz |
| Architects | Unknown architect |
| Construction Date | 2023 |
72 m high rise building embedded in a campus of various lower buildings (sports, dining hall etc.) Owned by Federal State of Germany.