| Condition | In recent years, renovation work and a new building were discussed. In use. |
| Architects | Carlfried Mutschler |
| Construction Date | 1971 |
As with Carlfried Mutschler's community center 1 km away, the red clinker was used together with the concrete. An elongated building, under whose flat roofs there is a secondary school and a high school. All rooms are connected by a long corridor track. The lying position of the building is reinforced by horizontal concrete bands on the façade.