| Condition | In use. Already during the construction process, the building started to deteriorate as the materials used were poor in quality. The project was revised several times, until a major reconstruction project was started in 2010. Today, the museum is in good condition. |
| Architects | Ramaz Kiknadze / Givi Metreveli |
| Construction Date | 2023 |
The structure of the museum is divided into seven units of different dimension and heights.