| Condition | After considerable structural defects (poor insulation etc.) it will be completely renovated from mid 2020. Presumably demolition of the characteristical brutalist features. Special thanks to Leon Beu |
| Architects | Unknown architect |
| Construction Date | 1974 |
A school swimming pool, which is occasionally open to the public.