| Condition | Renamed in 2005. Renovated in 2011. Intact and in use. It houses a pool, a gym and a café today. |
| Architects | Ivan Antić |
| Construction Date | 2023 |
Generic concrete building on the first two floors, third floor is a giant triangle, hanging far over the edges of the lower structure. Tower on top of the building. The swimming pool was built as part of the first World Aquatics Championships in 1973.